Page 12 - Diesel_Loco_Shed(MLY)
P. 12
Passenger Comfort improvement Initiatives:
S. Special Drive/Cyclic check/ modifications Loco/ Total Completed
No status DEMU
1. Modification of DEMU Coach Passenger seat DEMU 52 46
back rests
2. Provision of Venturi in toilets of DEMU
coaches DEMU 89 77
3. Replacement of push cocks in DEMU coach DEMU 89 77
toilets with modified ones
4. Modification to relocate the louvers on the DEMU 89 77
DEMU coach toilets doors
Status of Cyclic checks initiated by HQs:
S. Special Drive/Cyclic check status Loco/ Total Completed
No DEMU
1. Intactness of copper pipelines on air brake Loco 65 63
panel
2. Checking the intactness of couplers of CCB
Loco 04 04
3. Checking the intactness of MR tank auto
drain valve Loco 65 63
4. Brackets/fasteners for corrosion looseness
on DPCs & TCs DEMU 144 104
5. UT safety of outgoing locos Loco 65 40
5. Staff Welfare Measures:
a. Creation of Facilities for Employees:
1. Inauguration of “Cafeteria (Staff Canteen)” by DRM/HYB:
In lieu of dismantled Staff Canteen during PWP works, new building was constructed
to utilize as dining hall and erstwhile sub-station building has been renovated as
Kitchen and store room. The newly constructed/renovated Staff Canteen named as
“Cafeteria” has been inaugurated by DRM/HYB on 23.11.2020 in the presence of
ADRMs, BOs and representatives of Trade Unions and Associations.
76