Page 8 - Diesel_Loco_Shed(MLY)
P. 8
ii) Online training program of supervisors and ministerial staff:
As per the Railway Board guidelines, DLS/MLY has started online training classes for all
supervisors and ministerial staff from 27th April up to 29th May. All the supervisors and
ministerial staff have attended the online classes. Two phases for all the staff has been
completed. In both phases total of 5188 man days of training provided.
iii) Restoration of Steam loco tender trolley:
Restored the tender trolley of WP steam loco
Shed restored and placed the tender trolley of steam loco at the entrance of the new
DEMU shed which greatly enhanced the view of the shed.
iv) Laying of underground power cables to ETP Sump Pump with Shed Staff:
The existing ETP sump water pump was provided MCB protected 3 phase power
supply by laying underground cables to a length of about 50 m from DEMU pit line.
72