ii)   Online training program of supervisors and ministerial staff:

            As  per the  Railway  Board  guidelines,  DLS/MLY  has  started  online  training  classes  for all
            supervisors  and  ministerial  staff  from  27th  April  up  to  29th  May.  All  the  supervisors  and
            ministerial  staff  have  attended  the  online  classes.  Two  phases  for  all  the  staff  has  been
            completed. In both phases total of 5188 man days of training provided.


















               iii)  Restoration of Steam loco tender trolley:















                                        Restored the tender trolley of WP steam loco

              Shed restored and placed the tender trolley of steam loco at the entrance of the new
              DEMU shed which greatly enhanced the view of the shed.

                iv)  Laying of underground power cables to ETP Sump Pump with Shed Staff:



















                 The existing ETP sump water pump was provided MCB protected 3 phase power
                 supply by laying underground cables to a length of about 50 m from DEMU pit line.