B. MECHANICAL (POWER)


           1.0 Brief description: Mechanical (power) organisation is functioning under the control of
               Sr.DME/HYB with 3 Crew depots (KCG, NZB and GWD), one running room, 3 Rest Rooms
               and one RCD at KCG.

           1.1 Depot wise crew working beats.
                 DEPOT                       COACHING                                   GOODS
                                 SC/HYB-DHNE-SC/HYB                      KCG-DHNE-KCG/MLY/SNF
                                 HYB/SC-PAU-SC/HYB                       MLY-NZB-MLY
                  KCG
                                 GWD-RC-GWD                              KCG-CHZ-KCG
                                 MBNR-JKRL-MBNR
                                                                         NZB-MLY/SNF-NZB
                                 NZB-PAU-NZB
                  NZB            NZB-BDHN-NZB                            NZB-PAU-NZB
                                                                         NZB-BDHN-NZB
                                 NZB-KRMR-NZB
                                                                         NZB-KRMR-NZB
                                                                         GWD-DHNE-GWD
                  GWD                              -                     GWD-KCG-GWD
                                                                         GWD-RC-GED

           1.2 Combined crew booking lobbies:

                Crew booking lobbies are available at KCG, NZB and GWD.
                Computerized booking of Loco Pilots and Guards are combined at all the lobbies.
                All  the  3  lobbies  are  renovated  and  provided  with  furniture,  amenities  like Water
                  cooler with R.O system etc.
                Self-evaluation software like “Gyan Deep” made available for the purpose of educating the
                  loco running staff.
                Crew Management System developed  by  CRIS/New  Delhi  was commissioned  in  the
                  lobbies  (KCG, NZB and GWD)  in  the  division. CMS terminal was provided  at KRNT
                  100% CMS w.e.f., 01.10.2014.
                All the CMS Kiosks are integrated BA system and Webcams for the crew to undergo BA
                  test during sign ON and OFF.

           1.3 Running rooms/ rest rooms:

                  Following is the position of running rooms in the division and their bed strength:

                  a.  Running rooms:

                      Location          No.of Rooms            No.of Beds       Peak occupancy
                        NZB                  20                    60               40 (67%)
                        KCG                   3                    17              17 (100%)
                   b. Rest Rooms:

                      Location           No.of Rooms              No.of Beds     Peak occupancy
                       KRNT                    3                      15              6 (93%)
                        GWD        7 ROOMS & 12 Cubicles              26              7  (23%)
                       MBNR                    2                       7              4 (57 %)