Mid UK Recycling Driver Risk Assessment & Safe System of Work
Automatic Sheets:
Once the bin is safely loaded onto the vehicle the driver must net up the
bin prior to proceeding onto the public highway.
Operate the power control switch on the side of the vehicle and then
use the net remote control to cover the bin.
Whilst operating the sheeting controls
the driver must not stand directly
under the sheeting operation.
Using the remote control lift the
RASSoW 08Q
automatic sheet above the top of
RO-RO Lorry Operations
the bin to avoid it getting tangled
on the waste inside. Review Dates:
(V2) – 06-01-2025 / Next R/D 05-01-2026
Review by Steve Bennett