Page 2 - Mountain Transport - Skip Operations
P. 2

Mid UK Recycling       Driver Risk Assessment & Safe System of Work

                                       PART 1 – RISK ASSESSMENT – Skip Lorry Operations




       RA/SSOW NUMBER           Risk Assessment & Safe System of Work. -09Q                                                     REVISION No. 02




              TITLE             Skip Lorry Operations



      DESCRIPTION OF TASK       The operation of a skip lorry including loading, unloading, tipping, exchanging, netting and un-netting procedures. The
                                stacking of skips, using a torque wrench and company policies and procedures.



            LOCATION            Mountain Transport, London Road, Quarrington, Sleaford, Lincolnshire, NG34 8NX – Tel 01529 304 308



       ASSESSMENT TEAM           Mr Liam O’Brien       Mr Ian Rogers        Mr Fred Flatters      Mr Dean Newell           Miss Klaudia Pilat
     (List all people involved)   Group Head of       Fleet Compliance     General Manager       Transport Planner           H&S Advisor
                                      Fleet              Manager.


     Date of Initial Assessment  01/12/2020                               Next Review Date   05/01/2026




         Reviewed Date:         06/01/2025                                Reviewed By:       Steve Bennett / Rick Legg / Shared file with H&S



         Key:       S = Severity                 P = Probability                 RI = Risk Index                S x P = RI  Risk Index                                         RASSoW 09Q

                   Severity Description              Probability (how likely is the occurrence)  P  1  2  3  4  5                                                  Skip Lorry Operations
                                                                                   S
   1  No damage / no injury                     1  Practically impossible / highly unlikely  5  5  10  15  20  25
   2  Damage to plant / damage to environment / no injury  2  Not likely but small chance of happening  4  4  8  12  16  20
   3  Minor injury / illness (occupational)     3  Possible                         3   3    6   9   12   15                                                                       Review Dates:
   4  Major injury / illness (occupational)     4  Likely therefore assume can happen  2  2  4   6    8   10                                                 (V2) – 06-01-2025 / Next R/D 05-01-2026
   5  Fatality                                  5  Very likely therefore assume will happen  1  1  2  3  4  5                                                             Review by Steve Bennett
                                                                                                                                                            Approved by General Manager – Rick Legg
   1   2   3   4   5   6   7