MOCKDRILLS
MOCK DRILL AT FGD MOUDA PROJECT
Emergency for which mock-drill is conduct: Passenger Hoist Failure, Fall from Height.
Type of mock-drill: Practice Drill
Overall response time: 10 mnts
Sr. No. Good points of mock drill Observed shortfall in mock drill
Priya site engineer called immediately to the Experience First aider not available at
01
Ambulance from the location site during emergency.
Proactive response of the workers during evacuation.
02
Ambulance reached in time at the location.
Corrective actions initiated related to observed
Sr. No. Responsibility Target
shortfall in mock drill, Area of improvement
Hamza, Vaibhav and
Frequent mock drill required to improve Emergency Mangesh & Riyaj Frequently
01
response time. (Priya site engineer &
safety personnel)
Riyaj (Priya safety
Ambulance number shared to all the workers Immediate after mock drill
02 personnel)
through TBT.