MOCKDRILLS





      MOCK DRILL AT FGD MOUDA PROJECT


       Emergency for which mock-drill is conduct: Passenger Hoist Failure, Fall from Height.
       Type of mock-drill: Practice Drill
        Overall response time: 10 mnts



          Sr. No.              Good points of mock drill                     Observed shortfall in mock drill

                        Priya site engineer called immediately to the       Experience First aider not available at
             01
                               Ambulance from the location                         site during emergency.
                    Proactive response of the workers during evacuation.
             02
                         Ambulance reached in time at the location.


                      Corrective actions initiated related to observed
          Sr. No.                                                         Responsibility            Target
                        shortfall in mock drill, Area of improvement

                                                                       Hamza, Vaibhav and
                    Frequent mock drill required to improve Emergency    Mangesh & Riyaj         Frequently
             01
                    response time.                                     (Priya site engineer &
                                                                        safety personnel)
                                                                        Riyaj (Priya safety
                    Ambulance number shared to all the workers                               Immediate after mock drill
             02                                                            personnel)
                    through TBT.