                        •  Signal and communications cables shall run along grounded metal surfaces like metal
                            conduits, metal trunking or ducts, preferably away from power cables.  They should
                            not run on open trays alongside power cables.

                        •  The conduits shall be installed with insulated fixings as required to ensure grounding
                            only at one end.  For conduit sizes follow the local electric codes.

                        •  Shielded cables should have the shield grounded only at one end of cable segments
                            to avoid circulating currents through the shield.


              5.2.  Sensor Terminations Termination
                        SM  sensors  for  a  GuardII+  require  a  separate  termination.    Refer  to  the  SM  Sensor
                     Installation Guide for instructions to install the sensors and termination box.

              5.3.  Mounting Location

                        Excessive cable lengths distort SM signals.  The standard GuardII+ SM installation kit
                     includes  cables  for  connecting  the  monitor  to  the  termination  box;  the  distance  from  the
                     Terminal Box to the monitor should be less than 10 m (33’).  If the cable lengths required
                     appear  to  be  unavoidably  long,  please  contact  Iris  Power  LP  for  consultation  or  possible
                     alternatives.















                                         Figure 5-1 GuardII+ SM Installation Location
                                    Note:
                                    Different  GuardII+  monitoring  technologies  have  different  installation
                                    location requirements.  When deciding on the installation location for the
                                     monitor, be sure to consider all the installed monitoring technologies.

              5.4.  Preparation

                        Once  unpacked,  the  SM  card  should  remain  for  at  least  two  hours  at  the  place  of
                     installation to ensure ambient temperature equalization and to prevent moisture condensation
                     before energizing.