Page 20 - Library
P. 20
BSIT
Bachelor of Science in Information Technology
For the PRESIDENT/B section
Level III Phase 2
e.library UDGET/ (M/D)
section LIBRARIANS A total of
15 units
swivel
chairs by
2022
3. Installation Procurement 2020- LIBRARY 3 aircon TRUS Fully
of Air-condition of 2 air- 2022 INCOME units, T airconditi
Units air- condition units 3tons/ oned
condition units PRESIDENT/B per year library by
for Main, UDGET/ with 2022
Dumingag, LIBRARIANS installati (Main,
Pagadian) with on fee Duminga
installation fee 255K/YE g &
AR Pagadian
)
4. New Corner Procurement 2020- LIBRARY 75K TRUS Additiona
Sets for of corner sets 2022 INCOME T l 3 new
periodical for periodical 1 corner corner
section section PRESIDENT/B set per sets ( for
(3 units corner UDGET/ year 1 Main, 1
sets (asso. LIBRARIANS Pag and
color) made to 25k 1 for
order designs) /SET Duminga
g)
5. Installation Procurement 2020 LIBRARY 200k TRUS Functiona
of Fixed Sound of INCOME T l sound
System at the microphones, system at
AVR microphone PRESIDENT/B AVR
stand, UDGET/ (Main &
rostrum, LIBRARIANS Duminga
sound system g)
set
7. Bookshelves Procurement 2020- LIBRARY 200K/YE TRUS Additiona
(Steel , made of steel 22 INCOME AR T l 60 units
to order bookshelves, Steel
design) 20 20 units PRESIDENT/B 20 units Bookshel
units steel UDGET/ per year ves for
bookshelves LIBRARIANS different
campuse
www.jhcsc.edu.ph “Quality Education for Service” P a g e 19 | 301