Page 42 - 2019 Supra Technical NMT
P. 42
Supra – Software update and control unit replacement
Programming – programming trigger
• A programming operation must only be carried out as a result of the
following triggers:
- ISTA identifies a problem that is linked to software of a control unit
during a test module or plan
- A control unit is faulty and needs to be replaced
- Programming instructed by the Technical Department, e.g. via a TSB
• Supra must not be programmed without a relevant trigger.
Programming with no correlation can cause further problems
THE ACADEMY