Page 63 - PPO Diaries
P. 63

www.flipbuilder.com ©®
   www.flipbuilder.com ©®
       PPO Diaries


                                                       ❖ A brief overview of the project
                                                       Working for a leading Indian pharma client, I was expected to
                                                       develop  an  operational  excellence  model  for  the
                                                       maintenance/engineering  team  of  the  client’s  formulation
                                                       plant.  The  project  revolved  around  analysing  the  as-is
                                                       systems of the client, identifying the gaps, proposing a to-be
                                                       model and an implementation roadmap of the same.

                                                       ❖ How is a normal day at the Internship?
                                                       Varied  largely  with  every  progressing  week.  In  the  initial
                                                       phase, it was more about acclimatizing to the work culture,
                                                       understanding the client processes followed by some taxing
                                                       phases of data collection. In the latter half, I was engaged in
                                                       analysis of the gathered data, development of to-be model
           NIDICHENAMETLA AJAY
                                                       and  client  presentations.  Overall,  once  clear  with  the
                           EY                          destination, a plan can be sketched out distributing the work

         __________________________________________    load evenly and ensuring that a usual day is not very hectic.
                                                       Having said that, if in consulting, be prepared to work for long
           GENERAL INFORMATION                         hours.

                  Batch: PGDIM 25                      ❖ What  are  the  challenges  faced  during


                 BTech: NIT, Calicut                       Internship?
                                                       Fortunately,  I  haven’t  encountered  any  substantial
                     Stream: EEE                       challenges. Having a proper plan of where you wish to see the
                                                       project going after your two-month stint, developing a good
                  Work Ex: Fresher                     network and maintaining contacts with influential people at
                                                       the client end will mostly help you sail through most of your

                                                       challenges.


       ❖ What did you do right and what did you do wrong?

       •  Some things that I did right – Maintaining a project tracker and updating the project progress to the mentor

          on a weekly basis, dividing the project into small pockets and aligning the stakeholders with your thought

          process, being open to suggestions and feedback. Apart, from these, I majorly owe the success to a senior

          of batch of 2019, who guided me throughout the project. This can be a major takeaway for all the interns –

          get in touch with your buddies/seniors as soon as you get to know your project. They will surely help you

          with the thought process, and/or will tag you with another senior who has worked on a similar project.
       •  Things that I did wrongly – Not able to recollect somethings which I can quote, but, mistakes do happen,
          quite often than desired. The most important thing is to correct those mistakes as and when you can, instead
          of leaving them unattended.






       62 | P a g e                                                                                                                                               T a t v a   1 2
   58   59   60   61   62   63   64   65   66   67   68