                                                      ❖ A brief overview of the project

                                                      Project  Details:  Optimization  of  Truck  Load  ability  in  K2
                                                      Shipments for Snacks and Noodles

                                                          Achievements:

                                                          1.  Implementation  of  Excel  Based  Tool  improved  Load
                                                             ability by 2.5 % (Cost saving of nearly 4 Cr/Year)
                                                          2.  Redesigned CFC improved Load ability and saved nearly
                                                             4.5 Cr/Year in Raw Material + Loading costs


                                                      ❖ How is a normal day at the Internship?

                                                      I interned at ITC Foods Limited Bangalore Division; there I was
           THORAT GANESH VIJAY                        part of the Production Planning team. My day usually started

                                                      by reaching to office at 9 AM, then I used to review my pending
                          ITC                         works and plan the day ahead. Once it’s over; I used to meet
        _________________________________________     my guide and discuss next course of action (whether to do the
                                                      data  analysis,  calling  the  stakeholders  or  visit  the
          GENERAL INFORMATION                         manufacturing plants as per the need). Throughout the day I

                                                      tried to talk to NITIE seniors and my team members regarding
                  Batch: PGDIE 48
                                                      the challenges I was facing and used to take their suggestions.
                Stream: Mechanical                    To capitalize on free time my guide may get in the evening, I
                                                      used to stay up late in office.
            Work Ex: KSB Pumps Ltd,                   Sometimes I had to visit the plants for few days, then there I

                                                      used to spend my time recording the current practices. After
                  Dar Al Handasah
                                                      brainstorming,  I  used  to  discuss  the  problems  and  possible
                                                      solutions with the stakeholders at the plant.



       ❖ What are the challenges faced during Internship?

       1. Understanding the project scope and aligning the stakeholders with the common objective points

       2. Collecting the right and relevant data for the project

       3. Finding the out of the box ideas to address the problem statement


       4. Maintaining the higher confidence regarding the outcome of the work
       5. Optimum use of time given by the guide/ other seniors to make most out of it.



       ❖ What did you do right and what did you do wrong?

       Right:

          1.  I was able to align all stakeholders with the objectives of the project and their expectations from it.