Page 371 - LHPS Kantor Wilayah DJPb DKI Jakarta
P. 371

No.         Uraian               Kondisi Lapangan           Nilai         Dokumen/Tools
                            NILAI F = Bobot Nilai Fx Total Nilai F
                                    = 3% x Total Nilai F
                                                                                 2.82

                    G.   KEPUASAN PEGAWAI (Bobot Nilai 4%)
                    1  Indeks Kepuasan                                                    Hasil survey
                 .        Pegawai            a.  81% – 100%                       100
                                             b.  66% – 80%                         80

                                             c.  < 66%                             60
                                  Total Nilai G = Nilai G.1                       100
                            NILAI G = Bobot Nilai Gx Total Nilai G
                                   = 4% x Total Nilai G
                                                                                    4
                 NILAI KINERJA DAN TATA KELOLA = JUMLAH NILAI A s.d NILAI
                                           G
                                  (Nilai Maksimum = 30)                         29.67
   366   367   368   369   370   371   372   373   374   375   376