Page 10 - John F Hunt Group Newsletter - SEP 2023
P. 10

Concrete Cutting
        St James’s Church Refurb...
        Daniel Sweeney,  Tom Seath,  Francesca
        Cohen  and  Katrina  Gresswell,  were
        joined by two local operatives, Dave Dare                                                                              The team at Grays have been super busy tidying up and re-organising the depot
        and  Adam Beckwith,  to  volunteer  at  St                                                                             and offices in readiness for the planned reconfiguration of the existing layout. This
        James’s Church in Piccadilly, refurbishing                                                                             will be shared with the Environmental (Asbestos Removal) Department and promises
        two basement rooms over the course of                                                                                  to be ergonomic and slick in design...we are hoping to have moved to the new
        two days.                                                                                                              area by early 2024!

        The  rooms  provide  a  safe  changing                                                                                 With a new management structure, Concrete Cutting is re-energised and pushing
        place for the local homeless community                                                                                 forward with changes to create a more streamlined and efficient department.
        to try on and choose new clothing in a
        well-presented private space.
                                                                                                                               Jetty Removal in Holehaven


                                                                                                                               Creek...
        Last Quarter Data! (April – June)                                                                                      The  Port  of  London Authority  engaged
                                                                             We have a new Advance                             John  F  Hunt  Concrete  Cutting  to
                                                                                  to Zero document!                            remove the Jetty known as Holehaven
                                                                                                                               Pier in Holehaven Creek, Canvey Island,
                                                                                This handy document                            a tidal area of the Thames.
                                                                             gives an overall picture of
                                                                              how John F Hunt Limited                          The  structure  has  been  subjected  to
                                                                               is managing our carbon                          vandalism and there were concerns for
                                                                                 footprint and will be                         its structural safety and stability. A river
                                                                               updated continuously.                           tugboat  was  used  to  haul  a  pontoon,

                                                                                                                               which  was  carrying  a  John  F  Hunt
                                                                                  You can view it by                           Plant  Hire  PC210,  loaded  at  Dartford
                                                                                     clicking here                             and  carried  down  the  Thames  by  the
                                                                                                                               Tugboat.


                                                                                                                               The  Pier  is  being  demolished  from  the
                                                                                                                               top  down  and  involves  the  staged
        John F Hunt & Normative...                                                                                             demolition of the Jetty, timber office  and

        John F Hunt is now working with the world’s                                                                            associated mechanical equipment. This
                                                                                                                               will be followed by the deck and support
        first  carbon  accounting  engine  called                                                                              structure,  with  either  the  extraction  or
        Normative,  to  calculate  our  carbon                                                                                 cutting to bed level of the piles.
        emissions.  Normative  is  an  advanced
        carbon accounting engine that provides                                                                                 Two small safety boats stand by in the
        100% coverage across scopes 1, 2, and                                                                                  water  for  emergencies  and  a  PC138
        3  and  high-resolution  insights  to  help                                                                            machine is now loading lorries to remove
        identify actionable emissions reductions.                                                                              the demolition arisings for onward re-use
        Click  here    to  learn  more  about  our                                                                             and recycling.
        partnership with Normative.




             Currently, we are in the auditing                                                                                                                         New recruits needed!
                process to achieve our new                                                                                             Due to an ever-increasing workload in our Northern and Scottish depots,
              standard ISO 50001 for Energy                      Check out this Lego excavator with added                            our Concrete Cutting operations are seeking experienced Diamond Drilling
                        Management!                            John F Hunt stickers made by the talented Tom                                    Operatives (NVQ 2) for continuous work across the region.
                                                                 Seath - a great addition to our head office!

       10                                                                                                                                                                                                                             11
   5   6   7   8   9   10   11   12   13   14   15