Page 2 - COMPREHENSIVE_SITE_ASSESSMENT_REPORT_IMAGES_FOR_VOLUME_03
P. 2

HEAD OFFICE                     |VAT REGISTRATION NUMBER          |4960317727  FLEET & EQUIPMENT
                                       PHYSICAL ADDRESS:Ground Floor – Building 2   |NHBRC REGISTRATION NUMBER   |4000013824                                                                               IN-HOUSE EARTHMOVING FLEET UNITS)  INSURANCE
                                                                       |CIDB GRADING DESIGNATION   |   GNSS RTK SURVEY EQUIPMENT  PUBLIC LIABILITY COVER| R5 MILLION
                                       Gleneagles Park 10Flanders Drive Mount Edgecombe  |CSD SUPPLIER NUMBER               |  SCAFFOLDING & FORMWORK SYSTEMS  PROFESSIONAL INDEMNITY| R2MILLION
                                           POSTAL ADDRESS: P.O. Box 582 Westville 3630  TAX CLEARANCE CERTIFICATE    |SARS COMPLIANT    HUMAN RESOURCES   ALL RISK COVER        | R10 MILLION
                                                                       |B-BBEE LEVEL                 |LEVEL 1   BARGAINING COUNCIL REGISTRATION|BCAWU COMPLIANT                      BANK DETAILS
                                           TEL: +27 73 557 1040        Fax:
                                                                       CSD SUPPLIER NUMBER          |REGISTERED  PERMANENT CREW |TRAINED ARTISANS PERSONNEL  ACCOUNT TYPE  | BUSINESS CHEQUE ACCOUNT
                                       EMAIL: admin@dsonindustries.co.za  MASTER BUILDERS ASSOCIATION  |MEMBER  QUALIFIED SITE SAFETY OFFICERS --2  |FIRST NATIONAL BANK — ACC NO: 63104084883, |
                                       WEBSITE: www.dsonindustries.co.za  CIVIL ENGINEERING & CONSTRUCTION WORKS  INHOUSE ENGINEERS AND DRAUGHTSMAN  BRANCH WESTVILLE (250655), SWIFT: FIRNZAJJ |
                                                                                                   FULL SAFETY COMPLIANCE (ISO 45001/OHS ACT)  ACCOUNT TYPE  | BUSINESS CHEQUE ACCOUNT





                 1. PROJECT IDENTIFICATION DATA



                  Parameter                     Details


                  Report ID                     DSN-SPN-2025-4A 7C9B2E8F1D


                  Report Date                   17  November 2025

                  Field Survey Date             14  November 2025


                  Client                        Sappi Clan Nursery


                  Client Representatives        Mr. Bongani Shozi (Head of Operations - Clan Nursery Wartburg), Mr. Cele (Deputy)


                  Contractor                    Dson Industries Pty Ltd

                  Survey Team                   Hudson (Civil Field Surveyor), Simba (Field Assistant)


                  Financial Year                2026 CAPEX Consideration

                  ◄                                                                                                                           ►






                 2. SITE PARTICULARS




                   Site Parameter                         Specification

                  Location
                                                          Wartburg, uMshwathi Local Municipality

                  District
                                                          uMgungundlovu District Municipality, KwaZulu-Natal

                  GPS Coordinates

                  Total Nursery Area                      300 000m²


                  Shade Facility                          147,000 m 2


                  Coverage Year of                        80% of total area


                  Operation Growing                       2014 (11  years operational)

                  Roof Cover & Gutters


                  Irrigation Storage


                  Workforce

                  Fleet Assets


                  ◄                                                                                                                           ►






                 3. EXECUTIVE SUMMARY



                 This assessment report presents findings from field surveys conducted at the Sappi Clan Nursery,

                 Wartburg. From our understanding of the site conditions observed during the 14 November 2025

                 survey, the facility's heavily trafficked surfaces surrounding core buildings and growing facilities

                 show signs of wear consistent with 11  years of operational service since 2014.
   1   2   3   4   5   6   7