Page 4 - COMPREHENSIVE_SITE_ASSESSMENT_REPORT_IMAGES_FOR_VOLUME_03
P. 4
HEAD OFFICE |VAT REGISTRATION NUMBER |4960317727 FLEET & EQUIPMENT
PHYSICAL ADDRESS:Ground Floor – Building 2 |NHBRC REGISTRATION NUMBER |4000013824 IN-HOUSE EARTHMOVING FLEET UNITS) INSURANCE
|CIDB GRADING DESIGNATION | GNSS RTK SURVEY EQUIPMENT PUBLIC LIABILITY COVER| R5 MILLION
Gleneagles Park 10Flanders Drive Mount Edgecombe |CSD SUPPLIER NUMBER | SCAFFOLDING & FORMWORK SYSTEMS PROFESSIONAL INDEMNITY| R2MILLION
POSTAL ADDRESS: P.O. Box 582 Westville 3630 TAX CLEARANCE CERTIFICATE |SARS COMPLIANT HUMAN RESOURCES ALL RISK COVER | R10 MILLION
|B-BBEE LEVEL |LEVEL 1 BARGAINING COUNCIL REGISTRATION|BCAWU COMPLIANT BANK DETAILS
TEL: +27 73 557 1040 Fax:
CSD SUPPLIER NUMBER |REGISTERED PERMANENT CREW |TRAINED ARTISANS PERSONNEL ACCOUNT TYPE | BUSINESS CHEQUE ACCOUNT
EMAIL: admin@dsonindustries.co.za MASTER BUILDERS ASSOCIATION |MEMBER QUALIFIED SITE SAFETY OFFICERS --2 |FIRST NATIONAL BANK — ACC NO: 63104084883, |
WEBSITE: www.dsonindustries.co.za CIVIL ENGINEERING & CONSTRUCTION WORKS INHOUSE ENGINEERS AND DRAUGHTSMAN BRANCH WESTVILLE (250655), SWIFT: FIRNZAJJ |
FULL SAFETY COMPLIANCE (ISO 45001/OHS ACT) ACCOUNT TYPE | BUSINESS CHEQUE ACCOUNT
2
2
Note: Standard rate RI 75.00/m I Demonstration rate: R85.00/m represents potential savings ofR540,000.00
2
6.2 GS DRYSTACK RETAINING WALL (147.4 m )
Proposed Scope Summary:
The G8 area retaining structure would incorporate:
• GNSS RTK alignment and foundation works
• Interlocking drystack concrete blocks (void-fill design)
• Geotextile and drainage installation
• Engineered backfill with mechanical compaction
• Structural verification and as-built documentation
Specifications:
Parameter Specification Unit Rate
Wall Length 134 linear meters Rl,250.00/m 2
Wall Height 1,100mm Included in rate
2
Total Area Standards 14 7.4 m face area Included in rate
Compliance SANS 10400-K (Retaining Structures) Included in rate
Total Investment R184,250.00 + VAT
►
7. FINANCIAL PROPOSAL: 2026 CAPEX CONSIDERATION
7.1 ITEMIZED COST SCHEDULE
Item Description Unit Quantity Rate (ZAR) Amount (ZAR)
1 Road Rehabilitation (Full Scope) m² 6,000 85.00 510,000.00
2 G8 Drystack Retaining Wall m² 147.4 1,250.00 184,250.00
►
7.2 FINANCIAL SUMMARY
Description Subtotal Amount (ZAR)
(Items 1 & 2) 694,250.00
VAT@15% 104,137.50

