Page 275 - McD_6118-AEW-XX-XX-NBS-A-001_Neat
P. 275

140 LOOSE LAID POLYETHYLENE GAS RETARDANT/ DAMP PROOFING
      • Substrate: site specific.
      • Manufacturer: Contractor's choice.
          - Product reference: Contractor's choice.
      • Thickness/ Gauge: site specific.
      • Joints:
          - Surfaces to be joined: Clean and dry beyond full width of joint.
          - Laps (minimum): 150 mm.
          - Sealing: Two continuous strips of double sided mastic tape between overlaps.
             Roll to provide gas tight joints.
      • Accessories: site specific.

150 LOOSE LAID BITUMEN DAMP PROOFING
      • Substrate: site specific.
      • Primer: Required.
      • Bitumen sheet: To BS 743.
          - Weight (minimum): 5.4 kg/m².
          - Number of layers: One.
      • Joints: Side laps minimum 100 mm.
          - Sealing: Continuous even application of bitumen lap cement.

180 SELF-ADHESIVE BITUMEN GAS RETARDANT/ DAMP PROOFING/ TANKING
      • Substrate: site specific.
      • Primer: Required.
      • Manufacturer: Contractor's choice.
          - Product reference: Agrément certified.
      • Number of layers: One.
      • Thickness/ Gauge: site specific.
      • Bonding: Full. Smooth out to exclude air.
      • Joints:
          - Surfaces to be joined: Clean and dry beyond full width of joint.
          - Laps (minimum): 150 mm.
          - Sealing: Roll to fully adhere.
      • Accessories: site specific.

210 FULLY BONDED BITUMEN DAMP PROOFING
      • Substrate: site specific.
      • Primer: Bitumen primer.
      • Bitumen sheet: To BS 743.
          - Weight (minimum): 5.4 kg/m².
          - Number of layers: One.
      • Bonding: Hot applied bonding compound.
      • Joints: Side and end laps minimum 100 mm and 150 mm respectively.
      • Sealing: Fully bond.

RotF generic (intermediate) NBS 2014  6118-AEW-XX-XX-NBS-A-01
   270   271   272   273   274   275   276   277   278   279   280