850 LAYING PRECAST CONCRETE PAVING SLABS
      • Condition of substrate: Clean.
      • Setting out: Minimize cutting.
      • Joints: Open.
          - Width: 3 mm .
      • Perimeter upstands: site specific mm wide, filled with chippings.
      • Completion: Slabs must be level and stable.

880 APPLYING UV RESISTANT SEALER
      • Coverage per coat (minimum): manufacturers recomendation.
      • Surface coverage: Even and full.

890 APPLYING WALKWAY PROTECTIVE COATING
      • Coverage per coat (minimum): manufacturers recomendation.
      • Surface coverage: Even and full.

          COMPLETION

910 INSPECTION
      • Coating surfaces: Check when cured for discontinuities.
             Defective areas: Apply another coating.

920 ELECTRONIC ROOF INTEGRITY TEST
      • Testing authority: The roofing contractor .
      • Timing of test: Give notice .
      • Condition of roof prior to testing:
          - Coating: Complete to a stage where integrity can be tested.
          - Surface: Clean.
      • Test results: Submit.
      • Waterproof integrity certificate: On completion of testing, submit.

940 COMPLETION
      • Roof areas: Clean.
          - Outlets: Clear.
          - Flashings: Dressed into place.
      • Work necessary to provide a weathertight finish: Complete.
      • Storage of materials on finished surface: Not permitted.
      • Completed coatings: Protect against damage.