Page 39 - McD_ROTF DRAINAGE & PIPED SERVICES_Neat
P. 39

Drainage & Piped Services Standard Specification
Version 2014-1

 Rainwater drainage system pre-handover checks type A
 Construction rubbish, debris, swarf, temporary caps and fine dust which may enter the rainwater

         system: Remove. Do not sweep or flush into the rainwater system.
 Access covers, rodding eyes, outlet gratings and the like: Secure complete with fixings.

Documentation type A
 Operating and maintenance instructions:

                  Scope: Submit for the system giving optimum settings for controls.
                  Product information: Include product description, date of purchase, performance
                 characteristics, application (suitability for use), method of operation and control, and
                 cleaning and maintenance requirements.
                  Format: Paper copy.
                  Number of copies: Two
 Record drawings:
                  Content: Location, size and route of drainage services and Location of outlets.
                  Format: Electronic.
                  Number of copies: Two
 Submittal date: At handover.

System Performance

Design of gravity rainwater drainage system type A
 Design: Complete the design of the rainwater drainage system.
 Standards: In accordance with E&W Building Regulations Approved Document H, H3, Section 1 and

          To BS EN 12056-3, clauses 3–7, Annex A and National Annexes.
 Design parameters:

                  Roof and gutter construction and finish:
                  Design life of building: 50 years.
                  Design rate category: Category 2 to BS EN 12056-3, NB.2.1 and Category 3 to BS EN 12056-
                 3, NB.2.1.
                  Available capacity of existing below ground drainage (maximum):
 Requirement: Submit proposals including detailed design drawings, technical information,
         calculations and manufacturers’ literature.

Products

Gravity rainwater outlets
 Manufacturer: Aco Fulbora or equal and approved
 Roof construction:

                  Form: Manufacturer's standard.
                  Roof insulation thickness: Submit proposals.
 Material: Submit proposals.
 Grating: Flat.

                           3/7

McDonalds Restaurants Ltd
   34   35   36   37   38   39   40   41   42   43   44