Page 36 - McD_ROTF DRAINAGE & PIPED SERVICES_Neat
P. 36
Drainage & Piped Services Standard Specification
Version 2014-1
Externally socketed pipes and fittings: Fix with sockets facing upstream.
Jointing:
Method: Push fit.
Jointing differing pipework systems: Use adaptors intended for the purpose.
Cut ends of pipes: Clean and square. Remove burrs and swarf. Chamfer pipe ends before inserting
into ring seal sockets.
Jointing or mating surfaces: Clean and, where necessary, lubricate immediately before assembly.
Fixing and jointing PVC-U eaves gutters type Supports to be as manufacturers standards with due
allowance for expansion
Fixing:
Supports:
Stability: Fix securely.
Fixing centres (maximum): Submit proposals.
Additional supports: At joints in gutters and near angles and outlets.
Fasteners: Round head wood screws.
Jointing: Clip jointed with integral gaskets.
Method: Clip jointed with integral gaskets.
Jointing differing gutter systems:
Cut ends of gutters: Clean and square. Remove burrs and swarf.
Jointing or mating surfaces: Clean and, where necessary, lubricate immediately before assembly.
System Completion
Testing rainwater drainage generally
Dates for testing: Give notice.
Period of notice (minimum): one week
Pipework: Complete, and fix securely. Make free from defects, obstruction and debris before
testing.
Testing:
Clean water: Provide.
Testing apparatus: Provide.
Smoke testing: Do not use.
Rainwater drainage gutter test
Preparation: Temporarily block all outlets.
Testing: Fill gutters to overflow level and after 5 minutes closely inspect for leakage.
Records of tests: Submit.
Rainwater drainage system maintenance instructions type A
Printed instructions: Submit at completion.
Contents: Recommended procedures for maintenance of the rainwater installation, including full
details of recommended inspection, cleaning and repair procedures.
3/4
McDonalds Restaurants Ltd