Page 136 - B6118-AEW-XX-XX-PP-A-0001_(P17)_Contractors Manual
P. 136

DESIGN





       D4 Overview of ERDDS Interior Décor Concepts






       D4.27  Toilet Layouts

       Where  WC provision is to be remodelled or            -  Natural Integrity  projects must use scheme
       extended, layouts should be designed in                  specific vanity basins as indicated below
       accordance with local Building Codes including:       -  Where vanity units are unable to be
                                                                accommodated, IPS mounted slimline basins
       -  Cubicle size including oversized space for            should be utilised as indicated.
         ambulant and fully accessible  cubicles as          -  Service requirements to all WC’s and urinals to
         required.                                              be to M+E designer details in accordance with
       -  Handing and direction of opening doors.               CDM Partnership performance specifications,
       -  Handrails.                                            including full IPS systems.
       -  Circulation and space parameters.                  -  Finishes  to  public  WC’s  are  identified  in  the
       -  Provision and location of all ancillary facilities    interior concept section of this manual.
         (WC roll holders, hand dryers, soap dispensers      -  Lighting to vanity basins is available via LAUK
         etc).                                                  in L2LEDGU10 or L4LEDS fittings.
       -  Where space permits, WHB provision should
         be via McDonald’s typical vanity basin units
         as indicated below.

















































        D4.27          Toilet Layouts                      5.0                        10 October 2017
   131   132   133   134   135   136   137   138   139   140   141