Page 5 - McDonald's Samsung Galaxy Tablet_Shopfitting V1.0_Neat
P. 5
1.0 Installation of Samsung Galaxy Tablet
1.1 Tools Required
Below is a list of the tools required to complete a Bouncepad Samsung Galaxy Tablet Installation effectively:
o Pencil
o Battery powered Drill with socket attachments
o 20mm / 25mm Drill Bit
o 6mm Drill Bit
o 7mm Spanner
o Socket Screw Driver
o Lock Thread Glue
1.2 Arrival On Site
Upon arrival on site the Celestra engineer will report to the Shift Manager to sign in to the Contractors
Register.
The engineer will complete a walk around with the Shift Manager to outline the works required & any impact
that these works will have with trade throughout his/her visit.
Where requested by McDonald’s, a site survey will be completed ahead of the visit to outline the works
required. Where this hasn’t been requested, a detailed instruction would have been provided by McDonald’s
of the works required.
1.3 Preparation of Working Area
The engineer will prepare the area in which they will be working by ensuring that it is made safe from staff or
Customers entering the area. This will be done by cordoning off the area to restrict access.
All tools will be kept within this area to ensure they are not in the way of Customers of Staf f or impact trade in
anyway.
5 Samsung Galaxy Tablet Shopfitting Standards