Page 159 - CRS Engineering
P. 159

iii) If tank quality for classification as RAT                        YES

                B) Tank Bund
                i) Is the top level of the bund uniform and                           YES
                as oer the standards?
                ii) Is the top width of the bund as per                               YES
                standards?
                iii) Are the slopes as per the standards?                             YES
                iv) Any dangerous gullies or scour of the                              No
                bund?
                C) Surplus Weir
                i) Condition                                               Both are ingood condition,
                ii) Is the Length adequate for Design                                 Yes
                discharae?
                iii) Is Danger Level marked                                           Yes,
                D) Condition of the Sluices
                E) Any Past history of Breach of the                                   No
                tank if so. details.
                D)













                            Assist^t Engineer,                            Deputy Executive Engineer,
                             Irrigation Section,                            Irrigation Sub-Division,
                                  YERPEDU                                       SRIKALAHASTI.







                                                                                              lAify—
                                                                        Assistant Divisional Engineer,
                                                                            South Central Railway,
                                                                                 RENIGUNTA.
   154   155   156   157   158   159   160   161   162   163   164