Page 163 - CRS Engineering
P. 163
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund uniform and YES
as oer the standards?
ii) Is the top width of the bund as per YES
standards?
iii) Are the slopes as per the standards? YES
iv) Any dangerous gullies or scour of the No
bund?
C) Surplus Weir
i) Condition Good
ii) Is the Length adequate for Design Yes
discharae?
iii) Is Danger Level marked Yes,
D) Condition of the Sluices Sluices 1 is to Restored
E) Any Past history of Breach of the Tank Bund breached at Collapsed Place of Sluice
tank if so. details. No:-l
D)
ant Engineer,Engineer,
Assistant Deputy E/ecXftfve Engineer,
Irrigation Section, Irrigation Sub-Division,
YERPEDU SRIKALAHASTI.
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.