Page 163 - CRS Engineering
P. 163

iii) If tank quality for classification as RAT                        YES

                B) Tank Bund
                i) Is the top level of the bund uniform and                           YES
                as oer the standards?
                ii) Is the top width of the bund as per                               YES
                standards?
                iii) Are the slopes as per the standards?                             YES
                iv) Any dangerous gullies or scour of the                              No
                bund?
                C) Surplus Weir
                i) Condition                                                         Good
                ii) Is the Length adequate for Design                                 Yes
                discharae?
                iii) Is Danger Level marked                                           Yes,
                D) Condition of the Sluices                                 Sluices 1 is to Restored
                E) Any Past history of Breach of the           Tank Bund breached at Collapsed Place of Sluice
                tank if so. details.                                                 No:-l
                D)














                                  ant Engineer,Engineer,
                            Assistant                                     Deputy E/ecXftfve Engineer,
                             Irrigation Section,                            Irrigation Sub-Division,
                                  YERPEDU                                       SRIKALAHASTI.








                                                                        Assistant Divisional Engineer,
                                                                            South Central Railway,
                                                                                 RENIGUNTA.
   158   159   160   161   162   163   164   165   166   167   168