Page 167 - CRS Engineering
P. 167

iii) If tank quality for classification as RAT                        YES


                B) Tank Bund
                i) Is the top level of the bund uniform and                           YES
                as oer the standards?
                ii) Is the top width of the bund as per                               YES
                standards?
                iii) Are the slopes as per the standards?                             YES
                iv) Any dangerous gullies or scour of the                              No
                bund?
                C) Surplus Weir
                i) Condition                                                          YES
                ii) Is the Length adequate for Design                                 Yes
                discharae?
                iii) Is Danger Level marked                                           Yes,
                D) Condition of the Sluices                                            -
                E) Any Past history of Breach of the                                  No
                tank if so, details.
                D)














                            AssistaT                                      Deputy Ex^ciJtnv'e Engineer,
                             Irrigation Section,                            Irrigation Sub-Division,
                                  YERPEDU                                      SRIKALAHASTI.









                                                                        Assistant Divisional Engineer,
                                                                            South Central Railway,
                                                                                 RENIGUNTA.
   162   163   164   165   166   167   168   169   170   171   172