Page 175 - CRS Engineering
P. 175

iii) If tank quality for classification as RAT                        YES


                B) Tank Bund
                i) Is the top level of the bund unifornn and                          YES
                as oer the standards?
                ii) Is the top width of the bund as per                               YES
                standards?
                iii) Are the slopes as per the standards?                             YES
                iv) Any dangerous gullies or scour of the                             No
                bund?
                C) Surplus Weir
                i) Condition                                                         Good
                ii) Is the Length adequate for Design                                Yes,
                discharae?
                iii) Is Danger Level marked                                          Yes,
                D) Condition of the Sluices
                E) Any Past history of Breach of the                                  No
                tank if so, details.













                            Assistant Brfgin'eer,                        Deputy'Exe'cuerC'6 Engineer,
                             Irrigation Section,                           Irrigation Sub-Division,
                                  YERPEDU                                      SRIKALAHASTI.









                                                                        Assistant Divisional Engineer,
                                                                            South Central Railway,
                                                                                 RENIGUNTA.
   170   171   172   173   174   175   176   177   178   179   180