Page 177 - CRS Engineering
P. 177

iii) If tank quality for classification as RAT                       YES

                B) Tank Bund
                i) Is the top level of the bund uniform and                           YES
                as oer the standards?
                ii) Is the top width of the bund as per                               YES
                standards?
                iii) Are the slopes as per the standards?                            YES
                iv) Any dangerous gullies or scour of the                             No
                bund?
                C) Surplus Weir
                i) Condition                                                         Good
                ii) Is the Length adequate for Design                                Yes,
                discharae?
                iii) Is Danger Level marked                                          Yes,
                D) Condition of the Sluices
                E) Any Past history of Breach of the                                  No
                tank if so, details.









                                                     0^'


                            Assistar^ Engineer,                          Depufy Exe'Cutiv6 Engineer,
                             Irrigation Section,                           Irrigation Sub-Division,
                                  YERPEDU                                      SRIKAI-AHASTI.









                                                                        Assistant Divisional Engineer,
                                                                            South Central Railway,
                                                                                 RENIGUNTA.
   172   173   174   175   176   177   178   179   180   181   182