Page 181 - CRS Engineering
P. 181
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund uniform and YES
as oer the standards?
ii) Is the top width of the bund as per YES
standards?
iii) Are the slopes as per the standards? YES
iv) Any dangerous gullies or scour of the No
bund?
C) Surplus Weir
i) Condition Damaged
ii) Is the Length adequate for Design Yes,
disrharae?
iii) Is Danger Level marked Yes,
D) Condition of the Sluices
E) Any Past history of Breach of the No
tank if so, details.
Surplus weir is to be reconstructed
Assist^r Engineer, DeputyE/edTtiVe Engineer,
Irrigation Section, Irrigation Sub-Division,
YERPEDU SRIKALAHASTI.
-TiA
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.