Page 185 - CRS Engineering
P. 185

iii) If tank quality for classification as RAT                        YES


               B) Tank Bund
               i) Is the top level of the bund uniform and                           YES
               as oer the standards?
               ii) Is the top width of the bund as per                               YES
               standards?
               iii) Are the slopes as per the standards?                             YES
               iv) Any dangerous gullies or scour of the                              No
               bund?
               C) Surplus Weir
               i) Condition                                                          Yes,
               ii) Is the Length adequate for Design                                 Yes,
               discharae?
               iii) Is Danger Level marked                                           Yes,
               D) Condition of the Sluices
               E) Any Past history of Breach of the                                   No
               tank if so. details.
                                                             sluice N. 2 is Reconstructed.











                            AssisWnp Engineer,                           Deput'      C0C1    ngineer.
                             Irrigation Section,                           Irrigation Sub-Division,
                                 YERPEDU                                       SRIKALAHASTI.









                                                                        Assistant Divisional Engineer,
                                                                           South Central Railway,
                                                                                RENIGUNTA.
   180   181   182   183   184   185   186   187   188   189   190