Page 187 - CRS Engineering
P. 187

iii) If tank quality for classification as RAT                        YES

               B) Tank Bund
               i) Is the top level of the bund uniform and                            No
               as oer the standards?
               ii) Is the top width of the bund as per                               YES
               standards?
               iii) Are the slopes as per the standards?                             YES
               iv) Any dangerous gullies or scour of the                              No
               hund?
               C) Surplus Weir
               i) Condition                                               Full Damaged both weirs
               ii) Is the Length adequate for Design                                 Yes,
               discharae?
               iii) Is Danger Level marked                                           Yes,
               D) Condition of the Sluices
               E) Any Past history of Breach of the                                   No
               tank if so, details.
                                                             Reconstructed both Surplus weirs and
                                                             !=;trpnnthpnina earthen hund










                            Assistant Erigme'er,                         Deputy ^xeSIitiive Engineer,
                             Irrigation Section,                           Irrigation Sub-Division,
                                 YERPEDU                                       SRIKALAHASTI.









                                                                        Assistant Divisional Engineer,
                                                                           South Central Railway,
                                                                                RENIGUNTA.
   182   183   184   185   186   187   188   189   190   191   192