Page 191 - CRS Engineering
P. 191

iii) If tank quality for classification as RAT                        YES


               B) Tank Bund
               i) Is the top level of the bund unifornn and                          YES
               as oer the standards?
               ii) Is the top width of the bund as per                               YES
               standards?
               iii) Are the slopes as per the standards?                             YES
               iv) Any dangerous gullies or scour of the                             No
               hund?
               C) Surplus Weir
               i) Condition                                                         Good
               ii) Is the Length adequate for Design                                 Yes,
               diqrharae?
               iii) Is Danger Level marked                                           Yes,
               D) Condition of the Sluices
               E) Any Past history of Breach of the                                  No
               tank if so. details.
                                                             Surplus weirs is to be Restored












                            Assista     n g'mear,                        Depu^^^utive Engineer,
                             Irrigation Section,                           Irrigation Sub-Division,
                                 YERPEDU                                       SRIKAi_AHASTI.






                                                                                            7^,

                                                                        Assistant Divisional Engineer,
                                                                           South Central Railway,
                                                                                RENIGUNTA.
   186   187   188   189   190   191   192   193   194   195   196