Page 191 - CRS Engineering
P. 191
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund unifornn and YES
as oer the standards?
ii) Is the top width of the bund as per YES
standards?
iii) Are the slopes as per the standards? YES
iv) Any dangerous gullies or scour of the No
hund?
C) Surplus Weir
i) Condition Good
ii) Is the Length adequate for Design Yes,
diqrharae?
iii) Is Danger Level marked Yes,
D) Condition of the Sluices
E) Any Past history of Breach of the No
tank if so. details.
Surplus weirs is to be Restored
Assista n g'mear, Depu^^^utive Engineer,
Irrigation Section, Irrigation Sub-Division,
YERPEDU SRIKAi_AHASTI.
7^,
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.