Page 204 - CRS Engineering
P. 204

Page No.2 of 2
                     (A) Inspection Details »-

                     Ci) Date oflnsnectinn
                     (ii) Name and Designatiorofthe inspeaction de^
                                                                    (1) SriC. Wilson Babu
                                                                    Asst. Divisional Engineer, S.C. Rly.
                                                                        ^ENIGUNTA
                                                                    (2)^ri _S.VenugopaI, M.Tech,
                                                                          Dy.Ex^cu^ve Engineer,
                                                                       _ Irrigation Sub-Division,
                                                                           thottambedu
                                                                    (3) Sri R.Guru Raghavendra Rao,
                                                                          Assistant ^gineer,
                                                                        Irrigation Section (minor)
                                                                          THOTTAMRPniT
                    (iii)Iftank isqualify forRAT
                                                                           - Yes -
                    rB) Tank Bund
                    (i) is the Top Level ofthe bund is uniform? And is
                   as per the standards ?                            — No-
                   (ii) are the sl^^sare as per the standards ?
                                                                     — No -
                   (iv) Any scours ofgullies are formed atD/S ofthe
                                                                   Gullies and rain cuts areformed atD/S ofthe tank bund
                   IBund

                    JC} Surplus weir

                    (i) Condition ofthesurplus weir               Good condition
                   (ii) is the length ofthe surplus weir is adaquate for
                   design discharge                                    - Yes —
                   (iii) Is the DamgerLevel is Marked
                                                                       -- Yes •
                   ( P) Condition of the sluice                   Reapairs to be doneto the Sluice


                   (E) Any pasthistory of Breachofthetank and ifso  The tank bund is breached at R/S flankT^erat^confiuenw poinT
                   givedetails                                    supply channeland R/S flank

                   (F) I.D. No. ofthe tank                        CH THO 009, OOOORU (^EN/RU)
                   (G)Railway affecting Bridge No. (Kms)          57 &58 atKm, (51/13-15 &51/17-19).




                                  Assistant Engin^^ *7-^^^
                               Irrigation Section (Minor)
                                                                                   Irrigation Sub-Division
                                 THOTTAMBEDU
                                                                                    THOTTAMBEDU







                                                                                 Asst. Divisional Engineer,
                                                                                   South Central Railway
                                                                                      RENIGUNTA
   199   200   201   202   203   204   205   206   207   208   209