Page 204 - CRS Engineering
P. 204
Page No.2 of 2
(A) Inspection Details »-
Ci) Date oflnsnectinn
(ii) Name and Designatiorofthe inspeaction de^
(1) SriC. Wilson Babu
Asst. Divisional Engineer, S.C. Rly.
^ENIGUNTA
(2)^ri _S.VenugopaI, M.Tech,
Dy.Ex^cu^ve Engineer,
_ Irrigation Sub-Division,
thottambedu
(3) Sri R.Guru Raghavendra Rao,
Assistant ^gineer,
Irrigation Section (minor)
THOTTAMRPniT
(iii)Iftank isqualify forRAT
- Yes -
rB) Tank Bund
(i) is the Top Level ofthe bund is uniform? And is
as per the standards ? — No-
(ii) are the sl^^sare as per the standards ?
— No -
(iv) Any scours ofgullies are formed atD/S ofthe
Gullies and rain cuts areformed atD/S ofthe tank bund
IBund
JC} Surplus weir
(i) Condition ofthesurplus weir Good condition
(ii) is the length ofthe surplus weir is adaquate for
design discharge - Yes —
(iii) Is the DamgerLevel is Marked
-- Yes •
( P) Condition of the sluice Reapairs to be doneto the Sluice
(E) Any pasthistory of Breachofthetank and ifso The tank bund is breached at R/S flankT^erat^confiuenw poinT
givedetails supply channeland R/S flank
(F) I.D. No. ofthe tank CH THO 009, OOOORU (^EN/RU)
(G)Railway affecting Bridge No. (Kms) 57 &58 atKm, (51/13-15 &51/17-19).
Assistant Engin^^ *7-^^^
Irrigation Section (Minor)
Irrigation Sub-Division
THOTTAMBEDU
THOTTAMBEDU
Asst. Divisional Engineer,
South Central Railway
RENIGUNTA