Page 205 - CRS Engineering
P. 205

I





                                                                              •                           Page No.3 of 3

                                                                (1) The side slopes ofthe Erragunta tank isnot up toM.I.
                                                                standards,top width of the bund is also less than the M.I.
            VI   (B) (iv)
                                                                standards. Gullies and burrowsare formed at D/S of the bund is to
                                                                be restored to the original M.I. standards


                                                                Repair works are tobe done tothe sluice ofthe Erragunta tank.






                 Any information










































                                                /



                                Assistant Engineer,                              Dy.Executive Engineer,
                             Irrigation Section (Minor)                          Irrigation Sub-Division
                               THOTTAMBEDU                                        THOTTAMBEDU










                                                                               Asst. Divisional Engineer,
                             "SHr                                                South Central Railway

                                                                                    RENIGUNTA









              P
   200   201   202   203   204   205   206   207   208   209   210