Page 209 - CRS Engineering
P. 209
Southern Railway, RENIGUNTA
2)Sri.S.Venugopal
Deputy Executive Engineer
Irrigation Sub-DivisionJHOTTAMBEDU
2)Smt. K.Madhavi
Assistant Executive Engineer
Irrigation Section, RENIGUNTA
iii) if tank qualify for classification as RAT Yes
B Tank Bund
Isthe top level of the bund unitorm and as per
i) standards?
Restoration of bund is required as per
Isthe top v\/idth of the bund as per standards?
ii) M.I.Standards
iii) Are the slopes as per the standards?
iV) Any dangerous gullies or scour of the bund?
C Surplus weir
i) Condition Need Repairs
ii) Isthe Length adequate for Design discharge? Yes
iii) Is danger Level marked Yes
D Condition of the Sluices Good
Any past history of Breach of the tank and if so,
E No
details
Assistant Executive Engineer Deputy Executive Engineer
Irrigation Section Irrigation Sub Division
RENIGUNTA THOTTAMBEDU
Assistant Division Engineer
Southern Railway
RENIGUNTA