Page 211 - CRS Engineering
P. 211
if
Southern Railway, RENIGUNTA
2)Sri.S.Venugopal
Deputy Executive Engineer
Irrigation Sub-Division,THOTTAMBEDU
2)Smt. K.Madhavi
Assistant Executive Engineer
Irrigation Section, RENIGUNTA
iii) Iftank qualify for classification as RAT
Yes
B Tank Bund
Good
isthe top level of the bund uniform and as per
Yes
i) standards?
Is the top wfidth of the bund as per standards? Yes
ii)
iii) Are the slopes as per the standards? Yes
iV) Any dangerous gullies or scour of the bund? No
C Surplus weir
i) Condition Good
ii) Isthe Length adequate for Design discharge? Yes
iii) Is danger Level marked Yes
D Condition of the Sluices Good
Any past history of Breach of the tank and ifso,
E No
details
Assistant Executive Engineer Deputy Executive Engineer
Irrigation Section Irrigation Sub Division
RENIGUNTA THOTTAMBEDU
7C/\. ,
Assistant Division Engineer
Southern Railway
RC-MICiONtA