Page 213 - CRS Engineering
P. 213
2)Sri.S.Venugopal
Deputy Executive Engineer
Irrigation Sub-DivisionJHOTTAMBEDU
2)Smt. K.Madhavi
Assistant Executive Engineer
Irrigation Section, RENIGUNTA
ill) Iftank qualify for classification as RAT
Yes
The entire Bund has to bestrengthened as per
B Tank Bund
M.I standarads
is the top level of the bund uniform and as per
i) standards? No
Is the top widthofthe bund as per standards?
ii) No
iii) Are the slopes as per the standards? No
iV) Any dangerous gullies or scour of the bund? No
C Surplus weir
i) Condition Need repairs
ii) Is the Length adequate for Design discharge?
Yes
iii) Is danger Level marked
No
D Condition of the Sluices
Good
Any past historyof Breach of the tank and ifso,
E
details No
0^
Assistant Executive Engineer Deputy Executive Engineer
Irrigation Section Irrigation Sub Division
RENIGUNTA
THOTTAMBEDU
Assistant Division Engineer
Southern Railway
t^eNi6oMT/q