Page 213 - CRS Engineering
P. 213

2)Sri.S.Venugopal
                                                                              Deputy Executive Engineer
                                                                         Irrigation Sub-DivisionJHOTTAMBEDU
                                                                                  2)Smt. K.Madhavi
                                                                             Assistant Executive Engineer
                                                                            Irrigation Section, RENIGUNTA
                 ill)   Iftank qualify for classification as RAT
                                                                                        Yes
                                                                     The entire Bund has to bestrengthened as per
                  B     Tank Bund
                                                                                   M.I standarads
                       is the top level of the bund uniform and as per
                 i)    standards?                                                       No
                        Is the top widthofthe bund as per standards?
                 ii)                                                                    No

                 iii)  Are the slopes as per the standards?                             No
                 iV)    Any dangerous gullies or scour of the bund?                     No
                 C     Surplus weir
                 i)     Condition                                                   Need repairs
                 ii)   Is the Length adequate for Design discharge?
                                                                                        Yes
                 iii)   Is danger Level marked
                                                                                        No
                 D     Condition of the Sluices
                                                                                       Good
                       Any past historyof Breach of the tank and ifso,
                 E
                       details                                                          No




                                                        0^
                                 Assistant Executive Engineer        Deputy Executive Engineer
                                         Irrigation Section              Irrigation Sub Division
                                           RENIGUNTA
                                                                           THOTTAMBEDU







                                                                  Assistant Division Engineer
                                                                     Southern Railway
                                                                         t^eNi6oMT/q
   208   209   210   211   212   213   214   215   216   217   218