Page 215 - CRS Engineering
P. 215
2)Sri.S.Venugopal
Deputy Executive Engineer
Irrigation Sub-Division,THOTTAIVIBEDU
2)Smt. K.Madhavi
Assistant Executive Engineer
Irrigation Section, RENIGUNTA
iii) Iftank qualify for classification as RAT Yes
B Tank Bund Need Restoration
Is the top level of the bund uniform and as per
Yes
i) standards?
Isthe top width of the bund as per standards? Yes
ii)
iii) Are the slopes as per the standards? Yes
iV) Any dangerous gullies or scour of the bund? No
C Surplus weir
i) Condition Need Repairs
ii) Isthe Length adequate for Design discharge? Yes
iii) Is danger Level marked No
Due to frequent cyclones, the sluice was
D Condition of the Sluices completely silted up and the same is to be
reconstructed
Any past history of Breach of the tank and if so, The tank was breached in 2009 rains and the
E
details same was closed by permanent restoration
Assistant Executive Engineer Deputy ^ecutive Engineer
Irrigation Section Irrigation Sub Division
RENIGUNTA THOTTAMBEDU
h—'
Assistant Division Engineer
Southern Railway