Page 219 - CRS Engineering
P. 219
2)Sri.S.Venugopal
Deputy Executive Engineer
Irrigation Sub-DivisionJHOTTAMBEDU
2)Smt. K.Madhavi
Assistant Executive Engineer
Irrigation Section, RENIGUNTA
iii) Iftank qualify for classification as RAT Yes
B Tank Bund
Isthe top level of the bund uniform and as per
i) standards?
Isthe top width of the bund as per standards? Restoration of bund is required as per M.l
ii)
standards
iii) Are the slopes as per the standards?
iV) Any dangerous gullies or scour of the bund?
C Surplus v\/eir
i) Condition Good
ii) Isthe Length adequate for Design discharge? Yes
iii) Is danger Level marked No
D Condition of the Sluices Good
Any past history of Breach of the tank and if so,
E No
details
Assistant Executive Engineer Deputy E>^cutive Engineer
Irrigation Section Irrigation Sub Division
RENIGUNTA THOTTAMBEDU
^ /
Assistant Division Engineer
Southern Railw/ay
RENIGUNTA