Page 224 - CRS Engineering
P. 224

IRRIGATION CIRCLE: CHITTOOR                         IRRIGATION DIVISION : TIRUPATI
                      irrigation SUB-DIVISION: TIRUPATI                   IRRIGATIONSECTION : TIRUPATI URBAN
                             Report on Post Monsoon condition of Railway Affecting Tanks for the year 2019-70


                      1   si. No.
                      2   District:                                     : Chittoor
                      3   Taluk/Mandal                                  : Tirupati Urban Mandal
                      4   Name of the Tank (or) bounded                 : Anna Cheruvu
                      5   Name of the District Map                      : 57 0/6
                          Agency responsible for the maintenance i.e., P.W.Dor  Water resources Department,
                      6
                          Panchayat Raj or Private
                                                                          Government of Andhra Pradesh
                      7   Railw/ay line affected milage                   135/42-135/44 , Br.No.: 200, Br.No.: 130
                                                     - i
                          Railway milage of coming or surplus course of the tank of
                      8                                                   135/42-135/44,
                          water course
                      9   Date of Inspection       ^
                                                                          13-02-2020
                      10  Name and Designationof the Inspe.ctiflg Officer  Sri. C. Wilson babu, ADEN, S.C.Railways,
                                                                          Renigunta
                                                                         SriR.M.V.Ramana Murthy, Asst.Engineer,
                                                                          Irrigation Section, Tirupati Urban
                          a) Standards ofthetank bund as pfff-the Railway Affecting
                      11                                                : No
                          Tank list
                          b) Arethere TBL slopes or other permanent marks to
                          verify whether top of bund isnot prescribed level  : NO
                          c)ln the top of bund anywhere belowprescribed level if
                          no specify change and storage ia-height       ; No
                          d)Are the top width andslopesaccording to standards
                          every where width less and indlcate'sjrtent by which It is :
                                                                         As per standards
                          less
                          e) Are there any dangerous gullies and cart tracks, opinion
                          must be required if so specify the location    No
                          f) Action taken to rectify defects noted in col: 11 (b) to II
                          (e)                        ^                  :  Restoration workcompleted recently
                          g) Progress of work of any on hand^nf^ the probable date
                          of completion of the work.                     N.A.
                      12.Surplus Weir
                          a) Length ofthe surplus weiras per the R.A.T. list
                                                                         20.50 Mts
                          b) Whether the work at site are as.per the list or not  :  Surplus weir needs repairs

                          Specifythevariations ifany                    ;
                          c) Whether the MWL has exceeded oranything happened
                          to indicate that the surplus water areadequate of  :
                                                                         No
                          inadequate
                          d) If sothe remindisi meaasures contemplated, action
                                                                         Estimate submitted
                         taken                     •'                  '
                      13. Si'uices and other Masonry works
                                  ^                  ^'
                         Are the sluices and the other masonry works ingood
                         1order, so as protect endanger safety of the bund.  Sluice Damaged and needs reconstruction
                      14  : Soecifv remarks if anv bv the insnertlnp thp nffirprII  uiiy  uj y  LIIC.ulMl.Cl  ,
                         Ifthe work is checked by Engineer and what action taken
                     15
                         i in the matter






                                        •of Railway petttgineer,
                                                                               i '. O
                                                ..ailway
                                                                                TiRUPATHI URBAN
                                        L   L.aguma,
   219   220   221   222   223   224   225   226   227   228   229