Page 220 - CRS Engineering
P. 220
ANNEXURE - II
PROFORMA FOR SUBMISSION OF R.A.T INSPEaiON REPORTS
S.No Description Remarks
1 General Particulars of RAT
1 Name of the Tank Yerramreddipalem Tank
2 District Chittoor
3 Name of the Village and Mandal Yerramreddipalem & Renigunta
4 Latitude & Longitude 13°37' 36.74" and 79° 28'46.76"
5 Affected Railway Bridgeand KM Bridge No.l97 @134/10-12
6 Railway section in between stations Renigunta to Koduru
Distance from Railway Bridge to Bund(along the
") z.^u Nm
l^m
7 Course of Nallah)
II Standard Hydraulic details
1 Catchment area 2.048 Sq.Km
2 Capacity of the tank 3.53 Mcft
3 Lowest Bed Level 97.5
4 FullTank Level (FTL) 100
5 Maximum Water Level (MWL) 100.6
6 Danger Level (DL) 101.1
7 Top Bund Level 102.1
8 Top width of the Bund 2.0 M
9 Side Slopes U/S 1.5:1 & D/S 2:1
10 Area of submergence at FTL 51 Acres
11 Area of submergence at MWL •
Are there any tanks in the Catchment Area of
Y6S
12 this tank
13 Are these tanks also classified as RAT's No
14 Name and details of these tanks
III Surplusweir
1 No of Surplusweir INo
2 Lengthes 53.5 M
3 Type of Surplusweir N.CWeir
4 Design Discharge 1175 Cusecs
IV Sluices
1 No of Sluices INo.
2 Location of Sluices 1) 270 M
3 Maximum Level discharge 24 Cusecs
4 Functional or not Not
V A Inspection details
i) Date of Inspection 14-02-2020
1) Sri.C.VMilson Babu
ii) Name & Designation of the inspection officials
Assistant Divisional Engineer
Southern Railway,RENIGUNTA
2)Sri.S.Venugopal
Deputy Executive Engineer