Page 221 - CRS Engineering
P. 221
%
Irrigation Sub-Division,THOTTAMBEDU
4 2)Smt. K.Madhavi
Assistant Executive Engineer
Irrigation Section, RENIGUNTA
ili) Iftank qualify for classification as RAT Yes
Restoration of Bund is required as per
B Tank Bund
M.I.Standards
Is the top level of the bund uniform and as per
No
i) standards?
Isthe top width of the bund as per standards? Yes
ii)
iii) Are the slopes as per the standards? No
iV) Any dangerous gullies or scour of the bund? No
C Surplus weir
i) Condition Good
ii) Isthe Length adequate for Design discharge? Yes
iii) Is danger Level marked Yes
D Condition of the Sluices Good
Any past history of Breach of the tank and if so,
E No
details
Ii^) /£)
Assistant Executive Engineer DeputyExecutive Engineer
Irrigation Section Irrigation Sub Division
RENIGUNTA THOTTAMBEDU
Assistant Division Engineer
Southern Railway
RENIGUNTA