Page 217 - CRS Engineering
P. 217
2)Sri.S.Venugopal
Deputy Executive Engineer
Irrigation Sub-Division,THOTTAMBEDU
2)Smt. K.Madhavi
Assistant Executive Engineer
Irrigation Section, RENIGUNTA
iii) Iftank qualify for classification as RAT Yes
B Tank Bund Good
Is the top level of the bund uniform and as per
Yes
i) standards?
is the top width of the bund as per standards? Yes
ii)
iii) Are the slopes as per the standards? Yes
iV) Any dangerous gullies or scour of the bund? No
C Surplus weir
i) Condition Need Repairs to 2nd Surplus Weir
ii) Isthe Length adequate for Design discharge? Yes
iii) Is danger Level marked No
D Condition of the Sluices Good
Any past history of Breach of the tank and if so,
E No
details
Assistant Executive ngineer Deputy Executive Engineer
Irrigation Section Irrigation Sub Division
RENIGUNTA THOTTAMBEDU
I
Assistant Division Engineer
Southern Railway
RtNlC-iONlTA