                y-Gi^^iPiTpartoiia^^                           ^ERUMAl.LA CHERUVU
                                                               'CHCI0031000PAK
                1 Name of the tank
                2 TankCo^___                                 '  'CHITTOOR
                                                                Vwilthota (V) PuthajapattuJlan^
                 3  District  _  - - '  ,  -
                 4 -NameofvlllageAMaid^                         13° 17' 50" & 79° 09' CO"
                                                                   KM  I
                                                                SSE PW CTO PTT-P^



                 11 SntidHydraulicDetaHs            'lUZZ        0,87 Sq.Miles
                  1 Catchment Area          -                    2.35 Mcft
                  2 Capaci^ onhe Tank                              313.03 M
                  3 Inwest Bed Le\^                                313.33 M
                  4 >ullTanJ<i:eveL(n"L)                           353.11 M
                  5 •Maximum w^terJevdCMV^
                  6 Dang®L':?^®tL—-                               + 314.83 M(Proposed)
                  T jopoLBuQ^?'-®-)                               + >0 M(3.00M Proposed)
                   8 Top width of Bund                            + 3nt 1.5:1 Rear 2;1
                 "^^9  Side slopes        -                       0^85 M.Sq.feet O.M M.Sq.M
                   10 'Area of submergence at Fit  —





                                                                  ^Nos.
                   III Surplusweir
                      No^of s^urp^iusw?'!l_-                      ^5.10M, 2)29.30M
                                                                  1)15.lUM,
                    1
                      "Lengths^o^uiplys^-                        " Payed by wash, and Masonry weir__
                    2
                  " 3^ Types ofjyrPL"l-^-®^-^'                    i62 Cft./Sec. or 6.09CUM/Sec
                       Design Djschar£®_ — ,
                    4
                    IV  Sluice
                       No. of Sluices
                    1
                       Location ofSlujces -  -
                       Locaiiui I vji
                    2
                              ^
                                   niCi
                    j Maximum De^gQ Djscharge_^                    toctioned
                    3
                    4  Functional_qr
                    V ,A. Inspe^iL5?^?^-                           20-02-2020          —iT'^ISD     GTb.Nellore @
                       ij Date]o^n5P?5^r                           :Srl D.S.Rajendra Prasad, Dy-t.t-,  irrigation Section
                                                                   IChlttoor., Sri H.Khader Baig ,  ^ ^.E.N, Pakala,
                                                                   Iputhalapattu &   Sri M.N.Knshnappa, A.U    |
                                                                    Sri V.Damu Raju, P.Way,Chittoor.
                                                                    IYes
                        B.TankBun^  _   - --                        Yes (BT Road is running on top of Bund)
                                                                    yes
                                                                    yes
                                                                     no

                         C. Surplus ^Ir
                         'iiOYs DanjerLeyel Mjrked?         ^ ^




                     Remarks;-The tank bund  lus weir work completed during 12/2008

                                                                        _.,^with Names.Designation ofIrrigationOfficial
                                                 of Railway
                                                                      _itive kngm»it»
                                                               Irrigation Sectiori^
                                                                PUTHALAPATTU.
                                                               Page16 of 21
                                                                                         DEPUTY EXECUTJIfE
                                                                                        IRRIGfi SUB-DIVIN. 6.D.NELL0RE @
                         A*st. Divl. Engineer
                                                                                                  CHITTOOR.
                      cT ^.     / S.C. Railway
                         irr;:^/tiRur.r
   248   249   250   251   252   253   254   255   256   257   258