Page 35 - CRS Engineering
P. 35

r





                                                       APPENDIX-II

                         PROFORMA FOR THE ANNUAL INSPECTION OF RAILWAY AFFECTING TANKS
                                            FOR THE YEAR ENDING WITH 7090


              1. District                                      S.P.S.R NELLORE
              2. Village / Panchayat Samithi                   Naidu Cheruvu / Venkatagiri
              3. Name of the Tank bounded water source         Naidu Cheruvu tank
             4. Number of the Diet map of Railway Affecting tank  111
             5. Agency responsible of the maintenance (I.e.) PWS
                Irrigation/Agl. Private etc.,                  :WR Dept / Venkatagiri.
             6. Railway mileage of crossing of surplus         KM 52 / 3 - 4 and 39/ 3- 4
                  (Also Railway Bridge No. affected)             BrNo; 59 and 46
             7. Railway mileage of crossing of surplus course
                of the tank of water source (also railway
                Bridge No. affected)                          : Yallakaru - Nidigallu

             8. Date of Inspection                            : 12/02/2020
             9. Name & Designation of Inspection Officer      : Sri G Raghuram Murthy
                                                               Deputy Executive Engineer, WR Dept.
             10. Bund
             a) Standards of the tank bund as per the Railway
                Affecting tank list
             b) Are there T.B.Lstones or other permanent marks
                to verify whether top of bunds as at prescribed
                level or not
             c) As the top of bund any whether below prescribed
                level Ifso, specify changes and shortage in height  Good Condition
             d) Are there dangerous gullies and car track runts etc
                which in your opinion must be repaired urgently?
                Ifso specify location
             e) whether the bund is constructed with the suitable
               Materials and proper slopes
             f) Action taken up to rectify defects noted in (b) to( c)
             g) Progress of work, ifany on hand and the probable
               date of completion of the work

             11. Surplus weir
                                                               Good condition
             a) Length ofsurplus weir as per the Railway Affecting
               tank list
             b) Whether the surplus at site are as perthe list or
               Not? Specify the variation ifany
             c) Whether either the M.W.L has exceeded or
               anything has expanded to indicatethat the surplus
               weirare indelete or made inoperative by
               forming bunds in front etc.
             d) Ifso the remedial measures completed and
               action taken
             12. Sluice and other Masonry works are in Sluices
                                                             : Good condition
                and other necessary works in good order as not to
                endanger the safety of the bunds
                                                              No
            13. Special remarks ifany by the Inspection officer

            14. When was the latest checked by the Deputy
               Executive Engineer^d what action iaken ofthe
               same Taluk Officer