APPENDIX-II
PROFORMA FOR THE ANNUAL INSPECTION OF RAILWAY AFFECTING TANKS
FOR THE YEAR ENDING WITH 7090
1. District S.P.S.R NELLORE
2. Village / Panchayat Samithi Naidu Cheruvu / Venkatagiri
3. Name of the Tank bounded water source Naidu Cheruvu tank
4. Number of the Diet map of Railway Affecting tank 111
5. Agency responsible of the maintenance (I.e.) PWS
Irrigation/Agl. Private etc., :WR Dept / Venkatagiri.
6. Railway mileage of crossing of surplus KM 52 / 3 - 4 and 39/ 3- 4
(Also Railway Bridge No. affected) BrNo; 59 and 46
7. Railway mileage of crossing of surplus course
of the tank of water source (also railway
Bridge No. affected) : Yallakaru - Nidigallu
8. Date of Inspection : 12/02/2020
9. Name & Designation of Inspection Officer : Sri G Raghuram Murthy
Deputy Executive Engineer, WR Dept.
10. Bund
a) Standards of the tank bund as per the Railway
Affecting tank list
b) Are there T.B.Lstones or other permanent marks
to verify whether top of bunds as at prescribed
level or not
c) As the top of bund any whether below prescribed
level Ifso, specify changes and shortage in height Good Condition
d) Are there dangerous gullies and car track runts etc
which in your opinion must be repaired urgently?
Ifso specify location
e) whether the bund is constructed with the suitable
Materials and proper slopes
f) Action taken up to rectify defects noted in (b) to( c)
g) Progress of work, ifany on hand and the probable
date of completion of the work
11. Surplus weir
Good condition
a) Length ofsurplus weir as per the Railway Affecting
tank list
b) Whether the surplus at site are as perthe list or
Not? Specify the variation ifany
c) Whether either the M.W.L has exceeded or
anything has expanded to indicatethat the surplus
weirare indelete or made inoperative by
forming bunds in front etc.
d) Ifso the remedial measures completed and
action taken
12. Sluice and other Masonry works are in Sluices
: Good condition
and other necessary works in good order as not to
endanger the safety of the bunds
No
13. Special remarks ifany by the Inspection officer
14. When was the latest checked by the Deputy
Executive Engineer^d what action iaken ofthe
same Taluk Officer
hn'
I'i
vv,s.
/Renigunu'
J