APPENDIX - II

                          PROFORMA FOR THE ANNUAL INSPECTION OF RAILWAY AFFECTING TANKS
                                             FOR THE YEAR ENDING WITH 2090

               1. District                                      S.P.S.R NELLORE
               2. Village / Panchayat Samithi                   Singamambapuram / Venkatagiri
               3. Name of the Tank bounded water source         Singamambapuram tank
               4. Number of the Dist map of Railway Affecting tank  110
               5. Agency responsible of the maintenance (I.e.) PWS
                 Irrigation/Agl. Private etc.,                  :WRDept/ Venkatagiri.
               6. Railway mileage of crossing of surplus        KM 43/14-15
                   (Also Railway Bridge No. affected)             BrNo: 50
               7. Railway mileage of crossing of surplus course
                 of the tank of water source (also railway
                 Bridge No. affected)                          : Venkatagiri - Yaliakaru

              8. Date of Inspection                            : 12/02/2020
              9. Name &Designation of Inspection Officer       : Sri G Raghuram Murthy
                                                                Deputy Executive Engineer, WR Dept.
              10. Bund
              a) Standards of the tank bund as per the Railway
                 Affecting tank list
              b) Are there T.B.Lstones or other permanent marks
                 to verifywhether top of bunds as at prescribed
                 level or not
              c) As the top of bund any whether below prescribed
                 level Ifso, specify changes and shortage in height  Good Condition
              d) Are there dangerous gullies and car track runts etc
                 which inyour opinion must be repaired urgently?
                 Ifso specify location
              e) whether the bund is constructed with the suitable
                Materials and proper slopes
              f) Actiontaken up to rectifydefects noted in (b) to( c)
              g) Progress of work, ifany on hand and the probable
                date of completion of the work

              11. Surplus weir
                                                                Good Condition
              a) Length ofsurplusweiras per the Railway Affecting
                tank list
              b) Whether the surplus at site are as perthe list or
                 Not? Specify the variation ifany
              c) Whether either the M.W.L has exceeded or
                anything has expandedto indicate that the surplus
                weirare indelete or made inoperative by
                forming bunds in front etc.
              d) Ifso the remedial measures completed and
                action taken

              12. Sluice and other Masonry works are in Sluices
                                                               Good Condition
                 and other necessary works in good order as not to
                 endanger the safety of the bunds
                                                               Good Condition
              13. Special remarks ifany by the Inspection officer

             14. When was the latest checked by the Deputy
                Executive Engineer ^d^hat action taken of the
                same Taluk Officer
                                           /2/V'

                                                                                                A ^ ^
                                                            VVate!          D.spamnt>nt            ot.tnrji;
                            ^^2; /,                              Sub Division,                  •7c-.
   32   33   34   35   36   37   38   39   40   41   42