opnPORMA FOR TMP ANIMl lAL INSPFCTinN OF RAILWAY AFFFCTING TANKS
phr thf year fnoing with 2020
S.P.S.R NELLORE
i. District Thimmayagunta / Venkatagiri
2 Village / Panchayat Samithi Thimmayagunta tank
3 Name of the Tank bounded water source 113
4 Number ofthe Dist map of Railway Affecting tank
5' Agency responsible of the maintenance (I.e.) PWS ; WRDeptI Venkatagiri.
' irrigation/Agl. Private etc., ; KM 39 / 5 - 6
6. Railway mileage of crossing of surplus BrNo: 46
(Also Railway Bridge No. affected)
7 Railway mileage of crossing of surplus course
ofthe tankofwatersource (alsorailway ; Venkatagiri - Yallakaru
Bridge No. affected)
: Ml 0212020
8. Date of Inspection ; Sri G Raghuram Murthy
9. Name &Designation of Inspection Officer Deputy Executive Engineer, WR Dept.
10. Bund
a) Standards of the tank bund as per the Railway
Affectingtank list
b) Are there T.B.L stones or other permanent marks
to verify whether top of bunds asatprescribed
level or not
c) As the top of bund any whether below prescribed
level If so, specify changes and shortage in height Good Condition
d) Are there dangerous gullies and car track runts etc
which in your opinion must be repaired urgently?
Ifso specify location
e) whether the bund is constructed with the suitable
Materials and proper slopes
f) Action taken up to rectify defects noted in (b) to( c)
g) Progress ofwork, if any on hand and the probable
date of completionof the work
11 Surplus weir
; Good condition
a) Length of surplus weir as per the Railway Affecting
tank list
b) Whether the surplus atsite are asper the list or
Not? Specifythe variation ifany
c) Whether either the M.W.L has exceeded or
anything hasexpanded toindicate that the surplus
weir are in delete or made in operative by
forming bunds in front etc.
d) If sothe remedial measures completed and
action taken
12. Sluice and other Masonry works are in Sluices ;Good Condition
and other necessaryworks in goodorderas notto
endanger thesafety of thebunds
No
13. Special remarks if any by the Inspection officer
14. When was the latest checked by the Deputy
Executive Engineer^nd what action taken of the
same Taluk Officep
/'2-y2y2o
I'VoLsr >^':..;;ouices DopaitrtiOrtt
Assistant Dsv.... i->gjneer W.S.rVi bub Division, VSMKATAGifii
S.C.Raiiway .inN.T,vy>iia