Page 39 - CRS Engineering
P. 39

APPENDIX-II

                       PROFORMA FOR THE ANNUAL INSPECTION OF RAILWAY AFFECTINGTANKS
                                           FOR THE YEAR ENDING WITH 2020

            1. District                                       S.P.S.R NELLORE
            2. Village / Panchayat Samithi                    Busapalem / Venkatagiri
            3. Name of the Tank bounded water source          Peddabandarupalli tank
            4. Numberof the Distmap of Railway Affecting tank  113
            5. Agency responsible ofthe maintenance (I.e.) PWS
               Irrigation/Agl. Private etc.,                 :WR Dept / Venkatagiri.
            6. Railway mileage ofcrossingofsurplus           : KM 30 /1 - 2
                 (Also Railway Bridge No. affected)             BrNo; 43
            7. Railway mileageof crossing ofsurplus course
               of the tank of water source (also railway
               Bridge No. affected)                          ; Venkatagiri - Yallakaru

            8. Date of Inspection                             12/02/ 2020
            9. Name & Designation of Inspection Officer       Sri G Raghuram Murthy
                                                              Deputy Executive Engineer, WR Dept.
             10. Bund
             a) Standards ofthetank bund as perthe Railway
               Affecting tank list
             b) Are there T.B.L stonesorother permanent marks
               to verify whether top of bunds as at prescribed
               level or not
             c) Asthetopofbund anywhether below prescribed
               level Ifso, specify changes and shortage in height  The tank bund Good condition
             d) Are theredangerous gullies and cartrack runts etc
               which inyouropinion must be repaired urgently?
               Ifso specify location
             e) whetherthe bund is constructed with the suitable
               Materials and proper slopes
             f) Action taken upto rectify defects noted in (b)to(c)
             g) Progress ofwork, ifany on hand and the probable
               date of completion of the work


             11. Surplus weir
                                                             ; Good condition
             a) Length of surplus weir as per the RailwayAffecting
               tank list
             b) Whether the surplus at site are as per the list or
                Not? Specify the variation ifany
             c) Whether either the M.W.L has exceeded or
                anything has expanded to indicate that the surplus
                weir are in delete or made in operative by
                forming bunds in front etc.
             d) Ifso the remedial measures completed and
               action taken

             12. Sluice and other Masonry works are in Sluices  Good condition
                and other necessary works in good order as not to
                endanger the safety of the bunds
                                                               No repairs required
             13. Special remarks ifany bythe Inspectionofficer


             14. When was the latest checked by the Deputy     No repairs required
                Executive Engineer^d what action taken of the
                sameTalukOfficef^/'^__^^^

                                                   2<>
                                                                OsprfV           Hnrjineer
                          Assi. ;                                               Oepartmen
                                                              W.S.H'i itiD Diviiiijii, VHWKATAGI'W         rv
                              \  .
                                                                                                                  -Si^!
   34   35   36   37   38   39   40   41   42   43   44