Page 71 - CRS Engineering
P. 71
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund uniform and YES
as ner the standards?
ii) Is the top width of the bund as per YES
Standards?
iii) Are the slopes as per the standards? YES
iv) Any dangerous gullies or scour of the No
bund?
C) Surplus Weir
i) Condition Good Condition
ii) Is the Length adequate for Design Yes
dje^charae?
iii) Is Danger Level marked Yes,
D) Condition of the Sluices
E) Any Past history of Breach of the - NO -
f-nnk if so. details.
•TP Deputf^E/ecCitiVe Engineer,
Assistant gineer,
Irrigation Section, Irrigation Sub-Division,
SRIKALAHASTI.
SRIKALAHASTI.
Assistant Divisional Engineer,
Soutii Central Railway,
renigunta.