Page 74 - CRS Engineering
P. 74
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund uniform and - YES -
as oer the standards?
ii) Is the top width of the bund as per - YES -
standards?
iii) Are the slopes as per the standards? - YES -
iv) Any dangerous gullies or scour of the - NO -
bund?
C) Surplus Weir
i) Condition - YES -
ii) Is the Length adequate for Design
discharae?
iii) Is Danger Level marked Yes
D) Condition of the Sluices NO,
E) Any Past history of Breach of the - NO -
tank if so, details.
Assistant ^^afe^^^Engineer, Deput'fE/e'c®:i've Engineer,
Irrigation Section, Irrigation Sub-Division,
SRIKAI-AHASTI. SRIKALAHASTI.
r
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.