Page 74 - CRS Engineering
P. 74

iii) If tank quality for classification as RAT                          YES


                  B) Tank Bund
                  i) Is the top level of the bund uniform and                           - YES -
                 as oer the standards?
                 ii) Is the top width of the bund as per                                - YES -
                 standards?
                 iii) Are the slopes as per the standards?                              - YES -
                 iv) Any dangerous gullies or scour of the                              - NO   -
                 bund?
                 C) Surplus Weir
                 i) Condition                                                          - YES   -
                 ii) Is the Length adequate for Design
                 discharae?
                 iii) Is Danger Level marked                                              Yes
                 D) Condition of the Sluices                                              NO,
                 E) Any Past history of Breach of the                                   - NO -
                 tank if so, details.















                         Assistant ^^afe^^^Engineer,                         Deput'fE/e'c®:i've Engineer,
                               Irrigation Section,                             Irrigation Sub-Division,
                                SRIKAI-AHASTI.                                     SRIKALAHASTI.




                                                                                       r



                                                                            Assistant Divisional Engineer,
                                                                               South Central Railway,
                                                                                     RENIGUNTA.
   69   70   71   72   73   74   75   76   77   78   79