Page 72 - CRS Engineering
P. 72

iii) If tank quality for classification as RAT                          YES

                  B) Tank Bund
                  i) Is the top level of the bund uniform and                            - NO -
                  as per the standards?
                  ii) Is the top width of the bund as per                                - NO -
                  standards?
                  iii) Are the slopes as per the standards?                              - NO -
                  iv) Any dangerous gullies or scour of the                              -YES -
                  bund?
                  C) Surplus Weir
                  i) Condition                                                           - NO -
                  ii) Is the Length adequate for Design
                  discharae?
                  iii) Is Danger Level marked                                             Yes
                  D) Condition of the Sluices                                             Yes,
                  E) Any Past history of Breach of the                                   - NO -
                  tank if so, details.















                                                lo.
                               :ant®ssitfee Enq
                         Assistant ^SEOia       ngineer,                      Deputy Ex^ciMve Engineer,
                                Irrigation Section,                             Irrigation Sub-Division,
                                 SRIKAI-AHASTI.                                     SRIKALAHASTI.









                                                                            Assistant Divisional Engineer,
                                                                                South Central Railway,
                                                                                     RENIGUNTA.
   67   68   69   70   71   72   73   74   75   76   77