Page 75 - CRS Engineering
P. 75

Proforma for Joint Inspection on R. A. T.

                                                    For the Year 2020-21
               SI                    Description                                         Remarks
               No
                I   General Particulars of RAT
                1   Name of the tank                                Bhimavaram Tank
                2   District                                        Chittoor District

                3   Name of the Village and Mandal                  Bhimavaram Village ,Srikalahasti Mandal
                4   Latitude & Longitude                            Lat 13° - 52' - 25" Long 79° - 36' - 50"
                    Affected Railway Bridge and Km                  The Tank Lies in-between Bridge No       51
                5
                6   Railway section in between stations             Venkatagiri & Yellakaru
                7   Distance from Railway Bridge to weir            Railway Line Cross the tank Bund & Fore Shore of
                    ( Along the Course of Nallah )                  the Tank.
               II   Standard Hydraulic Details
                1   Catchment Area
                    Capacity of the tank
                2
                3   Lowest Bed Level                                 +97.50M
               4    Full Tank Level ( F.T.L )                       + 100.OOM
                    Maxim Water Level ( M.W.L )                     + 100.60M
               5
                    Danger Level ( D.L )
               6
               7   Top of Bund Level ( T.B.L )                      + 102.lOM
               8   Top Width of the Bund                            3.00 M ( PRESENT TOP WIDTH )
                   Side Slopes                                     AT FRONT:- 1 V2 : 1 , AT REAR       2:1
               9
               10 Area of Submergence at FTL


               11  Area of Submergence at MWL                                                 -
               12 Are there any tanks in the Catchment of                                   NO
             "13 Are these tanks also classified as RATs                                     -
             "14   Names and details of these tanks                                          -
              III  Surplus Weir                                                              -
                   Number of Surplus Weirs                         ONE NUMBER ONLY ( 1 No Only )
               1
               2   Lengths of Surplus Weir                         27.00 M
                   Type of Surplus Weir                            B.C WEIR
               3
                   Design Discharge                                                          -
               4
               IV  Sluices
                                                                   FOUR NUMBERS ONLY ( 4 Nos Only )
               1   Number of Sluices
               2   Location of Sluices
               3   Maximum designed discharge                      2.50 CUSECS
                                                                   Repair
             •"T"  Functional or not
                   A) Inspection details
               V
                                                                                      55-02-2020
                   l)Date of Inspection
                    j)Name& Designation of the Inspection
             —'                                                                 1) Sri. C. Willson Babu,
                                                                              Assistant Divisional Engineer ,
             —"—
                                                                                  South Central Railway
                                                                                       RENIGUNIA                      —
                                                                        2) Sri. C.Adinarayana Naidu, B.Tech..
                                                                               Deputy Executive Engineer,
                                                                                  Irrigation Sub Division

                                                                                     3) Raghu Babu
                                                                                   Assistant Engineer ,
                                                                                 Irrigation Section No.2
                                                                                     SRIKALAHASTI
   70   71   72   73   74   75   76   77   78   79   80